I am wanting to use the BCS as a dual stage (heat and cool) controller for three different ferm chambers and a serving chamber- a chamber for ales, a chamber for ferm lagers, and a lagering chamber.
The cooling of these chambers are: two refrigerators, a freezer, and a muffin fan powered chamber that pulls air from the freezer to ferment the ales.
For heat, I plan on using a basic 110v light receptacle and ceramic bulb.
Do I need to have SSR's in place to run these? If so do I need one for both the heat and cool? Thanks. Just trying to get this ball rolling and figure this all out.
SSR's necessary for fermentation chambers?
-
- Posts: 27
- Joined: Wed May 20, 2009 10:41 am
Re: SSR's necessary for fermentation chambers?
Yes, you will need one ssr for each, so each can control a separate powered circuit for either heating or cooling.
Check out the Brew Buddy for iphone controlling your bcs-460.