This is how I have my boil and cooling setup
My Settings:
The Process:
Now the States
State 0: Starting the boil, element is at 100% until 190f
State 1: 190 is hit, element goes into 70% duty cycle, starts a hot break timer.
State 2: After hot break timer hops are added and timer starts for 45 minutes.
State3: Add immersion chiller, 2 minute timer until pump turns on.
State 4: Pump starts sanitizing recirculation with an 8 minute timer
State 5: Aroma hops, whirlfloc, etc added, and a button to confirm
State 6: Whirlpooling started, element power killed. Pump set to cool and set at 63f
State7: Settling, once 63 is hit by the pump it shuts down to a 15 minute settling timer.
After the timer ends, I pause the process and turn on the pump to pump to the fermenter....and that is boil/cooling for me!
Bryan