My Boil/Cooling Process

Describe your system and processes, and post your config file.
Post Reply
rabeb25
Posts: 23
Joined: Thu Jan 15, 2009 5:48 pm
Location: Albertville, MN
Contact:

My Boil/Cooling Process

Post by rabeb25 »

This is how I have my boil and cooling setup

My Settings:

Image
Image



The Process:

Image

Now the States
State 0: Starting the boil, element is at 100% until 190f

Image
Image

State 1: 190 is hit, element goes into 70% duty cycle, starts a hot break timer.
Image
Image

State 2: After hot break timer hops are added and timer starts for 45 minutes.

Image
Image

State3: Add immersion chiller, 2 minute timer until pump turns on.

Image
Image

State 4: Pump starts sanitizing recirculation with an 8 minute timer

Image
Image

State 5: Aroma hops, whirlfloc, etc added, and a button to confirm

Image
Image

State 6: Whirlpooling started, element power killed. Pump set to cool and set at 63f

Image
Image

State7: Settling, once 63 is hit by the pump it shuts down to a 15 minute settling timer.

Image
Image

After the timer ends, I pause the process and turn on the pump to pump to the fermenter....and that is boil/cooling for me!


Bryan
Post Reply